X
+44 (0)1743 298 100 info@geosmartinfo.co.uk
EnviroSmart Reports - Phase 1 Contaminated Land

EnviroSmart Pro

Order now

Download Product card

View an example report

EnviroSmart Report - Phase 1 contaminated land

Phase 1 Contaminated Land Desktop Study with Walkover and Preliminary Geotechnical Assessment

What does it solve?

The EnviroSmart Pro Report is the most comprehensive in our range of Contaminated Land Reports designed to assess whether a site has potential land quality issues, state who and what is at risk, and outline the solutions available.

Our consultants assess available environmental data and historical mapping to determine the risk level based on regulatory guidance, professional judgement, and years of experience.

EnviroSmart Pro includes all the features of the EnviroSmart and EnviroSmart Plus reports with the addition of a preliminary geotechnical assessment.

The preliminary geotechnical assessment is a desk based review of available geological and ground property data pertaining to your site. The information would be used to identify and assess the potential risks to the existing or proposed development from common geotechnical hazards.

As required, recommendations for further works will be presented to address any of the potentially significant hazards identified.

The report provides clear and pragmatic advice regarding the nature and potential significance of contamination and geotechnical hazards which may be present.

They are the most cost effective way to meet local authority planning conditions.

Benefits

  • Produced by specialist consultancy team with over 15 years experience
  • Our consultants have built a great working relationship with Local Authority Officers across the UK
  • Reports are widely accepted in support of planning applications and insurance
  • Low fixed price, great quality
  • Premium turnaround options available

Features

  • Well presented, clear, concise and conclusive report
  • ‘Traffic light’ risk rating for easy interpretation
  • Each report includes a Preliminary Risk Assessment in line with best practice and regulatory guidance:
    • Environment Agency’s CLR11 guidance: Model Procedures for the Management of Land Contamination
    • CIRIA C552: Contaminated Land Risk Assessment – A Guide to Good Practice
  • Includes consultation with Local Authority
  • Includes a walkover and visual assessment of the Site
  • A preliminary geotechnical assessment is included
  • Clear recommendations are given allowing you to move forward with your plans quickly

Your report includes

  • Historical map data review
  • Inclusion of latest UK environmental datasets including pollution hazards, landfills and neighbouring land uses.
  • Review of published BGS geology maps (solid and drift)
  • Review of published BGS borehole logs in the local area (if available and/or applicable to the site)
  • Review of stability hazards
  • Preliminary consideration of landscaping and foundation restrictions
  • Environmental designations and sensitive receptors including human health, groundwater and surface water
  • Review of customer-supplied documentary information
  • Regulatory consultation with the Local Authority
  • Detailed findings of the site walkover survey
  • Conceptual site model
  • Preliminary Land Contamination Risk Assessment
  • Preliminary Geotechnical Assessment
  • Clear recommendations

Assumptions

Reports based on:

  • Site location plan and proposed development plans are available
  • Site access is permitted
  • A site investigation is not required at this stage
  • The site is within the UK mainland*
  • Advance payment is made

**Excludes some parts of Scotland and Northeast England. If applicable, we will provide a specific quotation.

Pro

From £1,050+VAT

Desktop Study
Site Walkover
Preliminary Geotechnical Assessment

Delivery and turnaround

Typically, site walkover survey within 5 working days from instruction

Report delivery within 7 working days from the completion of site walkover.

Premium delivery may be available if your report is urgent.

Report will be sent in electronic format as a .pdf file straight to your inbox.

Hard copies available at an additional cost.


* When purchased at the same time

Get in touch