SuDS Map and Summary, Run-off Amount, Preliminary Assessment, SuDS Strategy
Planning applications require the developer to explore suitable SuDS options, starting with infiltration drainage. Whether infiltration can be achieved or not depends on the capacity of the ground to receive water.
The SuDSmart Plus Report is the second in our range of SuDS Reports designed to explore suitable SuDS options.
The report is based on GeoSmart’s innovative SuDS Infiltration Map, showing a site’s infiltration suitability (low, moderate, high) on a 50m grid providing total confidence during the early conceptual design stage.
SuDSmart Plus includes all the features of a SuDSmart Report with the addition of an outline SuDS strategy to offset the increase in surface water runoff from a new development.
The report typically supports developers and regulators in support of planning by creating and evaluating an appropriate drainage system for a site.
Need a Site visit? Our SuDSmart Pro Report provides the answer.
We can also supply a Detailed Drainage Design.
Reports based on:
If your site doesn’t fit these assumptions or you require a site visit, we can still assist but please do get in touch as one of our other packages may suit you better.
SuDS Map and Summary, Run-off Amount, Preliminary Assessment, SuDS Strategy
Provides in-depth details including pipe dimensions, cover and invert levels and gradients.
GeoSmart was asked to produce a SuDSmart Plus Report to assess how the development of greenfield land into residential properties may impact the flood risk to off-site receptors as a result of the increase in surface water runoff generated.