The FloodSmart Pro is the most detailed in our range of Flood Risk Reports designed to assess risks to a property or business.
The report is designed for sites in Flood Zone 3, where more detailed assessment is required to meet the needs of the Environment Agency and Local Authority planning conditions.
FloodSmart Pro includes all the features of a FloodSmart Plus Report with the addition of a review of the suitability of a proposed development and any necessary mitigation measures required.
Importantly, FloodSmart Pro involves consultation with key regulators at the earliest possible stage. This approach has proven invaluable for more complex sites located within Flood Zone 3 and can reduce the scope for regulatory rejection further on in the project timeline.
The report provides comprehensive, clear and pragmatic advice, together with details of further work that may be required to support the development through the planning process.
Reports based on:
If your site doesn’t fit these assumptions or you require a site walkover survey, we can still assist but please do get in touch as one of our other packages may suit you better.
FloodSmart Pro requires Environment Agency consultation and data.
Delivery is dependent on the Environment Agency response times to supply data, which can take up to 20 working days.
Typically your report will be dispatched 10 working days from receipt of the data.
Premium delivery is available if your report is urgent.
Report will be sent in electronic format as a .pdf file straight to your inbox.
Hard copies available at an additional cost.