01743 298100
enquiries@geosmartinfo.co.uk
GeoSmart Information
  • Home
  • Reports
    • Contaminated Land Reports
    • Flood Risk Assessments
    • Sustainable Drainage Reports
    • Detailed Drainage Design
  • Data & Services
    • Groundwater Flood Risk Map
    • SuDS Infiltration Map
    • BGS Geology Datasets
    • User Guides
    • GWFlood
    • GWSewerFlood
    • Flood Risk Portfolio
  • Risk
    • FloodSmart Analytics
    • Case Studies
    • News
  • Knowledge Hub
    • Contaminated Land
    • Flood Risk Assessment
    • Sustainable Drainage Systems
    • Groundwater Flood Risk
    • CPD
    • Videos
    • News
    • Events
    • Blog
    • Library
    • Case Studies
    • Latest GeoSmart e-Newsletters
  • About
    • Our Customers
    • Our Team
    • Our Partnerships
    • Testimonials
    • Careers
    • Our Responsibility
    • A Sustainable Future
    • FAQs
  • Contact

Demolition and Replacement Scheme After Flood Damage – Worcestershire

Posted in EnviroSmart

We were commissioned to complete a combined EnviroSmart Plus and FloodSmart Pro Report  to support our client by addressing a condition of planning which was attached to their application. Our report summarised potential risks to controlled waters and future users of the site, and levels of risk were identified and qualified through the formation of a preliminary risk assessment.

The site was located in close proximity to the River Severn and at constant threat of flooding. The planning condition was satisfied by our specialist consultants delivering a smoother path to permission.

The site was located in a predominantly rural area in Worcestershire, adjacent to the River Severn and located in a Flood Zone 3 area.

The client was looking to demolish a late Victorian cottage which had suffered extensive damage from flooding during early 2014. The damage was so extensive as to leave it financially unviable to repair and no longer possible to insure against future flood damage.

The outline planning application was to demolish the cottage and then develop the site with a new dwelling on the same footprint as the original but raising the structure up on stilts to eliminate any future risk of flooding.

The Contaminated Land Officer at the Local Planning Authority imposed a planning condition that related to a contaminated land report and possible remediation as historical mapping showed the presence of a historic landfill in an adjacent field.

The landfill had been used for the disposal of building waste and silt from the dredging of the River Severn. Due to the site’s proximity to the river, contamination threats from the current building, and the proximity to the adjacent landfill, the Local Planning Authority stated that a Phase 1 Contaminated Land Assessment with a Site Walkover should be a condition of granting planning approval.

Our specialist land quality consultant undertook a study of historical maps to identify past uses at the location and vicinity in order to assess the likelihood of historical contamination. It was noted that a building had been present on the site since the earliest available map dated 1886 and had gone through several stages of development. A large pit was identified in the adjacent field which on later maps was labelled as a refuse tip.

The Contaminated Land Officer was contacted to identify and discuss specific concerns that related to the site. This ensured that when the report was submitted our recommendations were well informed and addressed the specific issues identified by the Local Planning Authority.

A full review of the available environmental data was conducted and this was combined with information gathered during the site visit and walkover survey to qualify any contamination risks posed. This approach enabled our specialist land quality consultants to collate an overall risk assessment which established the threat to individual receptors, such as groundwater, surface water, and future occupants of the site.

Following the identification of the receptors and the potential sources of contamination, the contaminant pathways were reviewed to ascertain if a linkage existed that presented a risk and to determine the level of risk where these had been identified.

Due to the high threat of flooding and the extent of the damage caused to the current property, a flood risk assessment was considered necessary to validate the extent of the flood threat and to confirm that the defensive measures of the proposed development were sufficient.

We studied the specialist data sets and historic flood events to compile a flood risk assessment and report for the site. The flood risk assessment indicated that the site was at high risk of flooding from both fluvial (river) and groundwater flooding.

The recommendations were that an evacuation route was required, where possible, to provide a safe access and egress route from areas within the flood zone to an area wholly outside the flood zone. Further to this it was recommended that the height of the ground floor level should be above 16.91m AOD.

As the proposed site plans provided by the client indicated that the floor level would be constructed higher than this, no changes were required to the development plans.

Conclusion

The report’s conclusion was that the level of risk for contaminated land was considered low for both on-site and off-site receptors, leading to a recommendation that no further assessment (including any intrusive investigations) of the site was deemed necessary in relation to the proposed development.

The flood risk assessment proved that, although the site is located in a Flood Zone 3 and at risk of both fluvial (river) and groundwater flooding, the steps taken by the client with the design and mitigation measures would be sufficient to meet the requirements of the Local Planning Authority and protect the property from future flood damage.

If you have a complex site that combines flood and contaminated land risk, contact us for a specific quote to combined FloodSmart and EnviroSmart reports in one.

Share this Case Study
« Previous Post
Next Post »

Related Case Studies

Phase 1 Desk Study for a Former Public House
Phase 1 Contaminated Land Desk Study
Phase 1 Desk Study for Car Showroom
Phase 1 Desk Study and Site Walkover Survey for a…
Mixed Use Land Assessment, Manchester

See what our customers have to say...

"During the conveyancing process for my current house purchase, I was extremely concerned to find the general search results revealed the house was at 'moderate risk of groundwater flooding'. I was unable to get any further information from anyone until I contacted GeoSmart. The staff I spoke to were friendly, helpful, efficient and extremely knowledgeable. The information provided was very site specific and focused. The staff member who talked me through the information and maps provided was very knowledgeable, answered all my questions and allowed me plenty of time to discuss issues. Thanks to GeoSmart for their great service."
Linda Barton
"We were impressed by the speedy, well-informed service and personal contact that we received. The report was thorough and comprehensive. We will certainly use GeoSmart's services in the future"
Gregory Gray
Gregory Gray Associates
"I would like to say that dealing with GeoSmart was a seamless experience from beginning to end - thank you for that"
Martin Lloyd
Martin Lloyd Associates
"Everyone involved from initial approach to receipt of report was knowledgeable, efficient and focused"
Robert McCall
OeMO Ltd
"Great service! Extremely fast and the report was very detailed and well received by the planners. Many thanks GeoSmart, we will definitely use your services again"
Nigel Slack
Michael Eyres Partnership LLP
"The service was great, fast and efficient. Everyone we talked to was very helpful and the details were well received by the planners"
Ben Thorns
Solid Digital Marketing Ltd
"The service for a Phase 1 Contaminated Land Study was excellent, fast and efficient! GeoSmart were willing to assist despite the extremely tight timescale to work with. We will definitely consider using your services again"
Craig Roberts
Hunter Page
"Efficient and friendly service, GeoSmart provided a clear and concise report within the timescales advised. Great service and I would have no problem recommending"
Geraint Harris
Vitec Consult
"We are very pleased with the service provided by GeoSmart. Their reports have been used to assist with numerous planning applications and have always been delivered to budget and on-time, much to our clients’ appreciation. We look forward to working with GeoSmart on future projects"
Alan Gunne-Jones
Planning & Development Associates
"The service provided was efficient and friendly. From the first phone call to GeoSmart they provided a clear, professional approach to my request within the timescales advised. Great service and I would have no problem recommending"
John Childs
Private Developer
Find out more about how we can support you today!
Get in touch
Subscribe to our newsletter
© 2022 GeoSmart Information Ltd.

Suite 9-11, 1st Floor,
Old Bank Buildings,
Bellstone, Shrewsbury,
SY1 1HU

Company No. 5475394

Contact Us
Call 01743 298100
Email enquiries@geosmartinfo.co.uk
Legal Links
  • Privacy Policy
  • CDM Regulations
  • Terms & Conditions
Website by Ascendancy